Interlogix Concord Express Installation Manual Manual do Utilizador Página 30

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 29
Chapter 1
24 Concord Express Installation Instructions
Figure 18: Connecting the power transformer
Powering Up the Panel
Note: Without AC power, shutdown will occur if battery voltage falls below 10.2
VDC.
After installing SnapCards and wiring all devices to the panel, you are ready to
apply AC and backup battery power to the panel.
To power up the panel:
1. Connect the red and black battery leads (included with panel) to the lugs
located in the upper-left area of the panel circuit board (see Figure 19 below).
Figure 19: Connecting the backup battery
2. Connect the battery leads to the battery terminals as shown.
3. Plug the transformer into an outlet that is not controlled by a switch or ground
fault circuit interrupt (GFCI).
Vista de página 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 116 117

Comentários a estes Manuais

Sem comentários